Waverton House required extensive structural reconfiguration to support the sensitive renewal of this heritage-listed home by Castlepeake Architects.
The primary structural challenge was demolishing the rear façade while retaining the existing brick gable, a key part of the original house. To keep the structure stable during demolition, temporary supports known as needling (horizontal beams inserted through the wall) and propping (vertical supports beneath the beams) were designed to hold up the gable wall while the rear structure was removed.
Once demolition was complete, the gable was permanently re-supported on a new structural steel portal frame, carefully integrated into the new build. This frame reinstated the lateral and vertical stability previously provided by the demolished walls, while allowing the new rear extension to open fully to light, space, and garden connections.
The result is a refined structural intervention that enables significant spatial transformation, while preserving and celebrating the original gable as a key architectural feature.
01
02
03
Let's build somethingexceptional
We collaborate with leading architects, builders, and clients who share our passion for thoughtful and seamless design.